STEP 9: QUALITY INSPECTION & CLEAN UP
9.1
Once all panels are installed and roof tiles are replaced, apply a firm pull test to ensure all
attachments are secured firmly to the roof of the structure.
9.2
Account for all tools and jobsite related material and clean area as necessary.
This concludes the installation process of the SPIDER-RAX Black Widow mounting system.
Questions or concerns can be answered at
1-844-773-7729
Spiderrax.com
Patent pending P/N: BW-S, BW-B, BW-F.
Max applied load: 45psf
Torque 20 ft-lbs.
Fuse rating: 20A
Max number of modules and connections per ground lug: 10
Frame thickness: (29.36mm-40mm) (1.156”- 1.574”)